Floors are built in 4-7 days and parking levels are built in the same time to upwards of 14 work days.
Relatively speaking, not much progress has occured since the forms in the far left corner started being put in place on December 1, 2022. The shear wall and ramp were formed and poured before the middle of November, 2022 and the ground pad and colums were poured prior to November, 2022
After observing from this new vantage point, let alone directly on the ground on any other day, a reasonable question is how much construction progress can be expected in a single day even when all materials are at hand?
What can be observed is that building a highrise condominium and skyscraper construction is essentially hand craftsmanship aided by a crane to move and position objects of immense weight.

Pictured Right: A section of shear wall rebar is being assembled and tweaked with the aid of a crane suspending it.

With the segment off the ground, workers can manipulate the bottom of the section to ensure its constructed to specifications.

Just this one segment and stage of rebar assembly required over half an hour of the crane's time - or 1/16th of the workday.
More of the same deliberation is needed when the segment must be hoisted on the site and then tied into position.
Most projects commence with only 1 crane and the preponderance of projects that start with 2-3 actually complete the bulk of floors with just 1 crane.
1/4
1/4
With colums and shear wall in place in place, it took 8 days to form and pour a very small area.
1/4
1/4
1/4
1/4
1/4
1/4
1/4










In just 33 days, one project:
In 33 days, a project just down the street had:
The ATX Tower was heavily photographed on one day, i.e., November 8, 2022.
It broke ground on March 15, 2022, to complete shoring, excavation, 2 sub-levels, 11 above-grade levels of parking, and 47 mixed-use above-grade levels by July 23, 2024.
The Republic was heavily photographed from November 2022–January 2023.
It broke ground on June 15 and had shoring drills in place by July 1, 2022, or sooner, and did not require serious shoring or excavation.
It completed 15 levels of parking and 29 mixed-use levels by November 20, 2024.
It appeared as though direct observation put The Republic off a normal construction timeline during the period of time direct observation was undertaken.