tedtalk.ai

tedtalk.aitedtalk.aitedtalk.ai

tedtalk.ai

tedtalk.aitedtalk.aitedtalk.ai
  • Time I
  • Time II
  • Time III
  • Time IV
  • About Ted
  • Proposal
  • Proposal Added Incentive
  • Additional Timestamps
  • More
    • Time I
    • Time II
    • Time III
    • Time IV
    • About Ted
    • Proposal
    • Proposal Added Incentive
    • Additional Timestamps
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Time I
  • Time II
  • Time III
  • Time IV
  • About Ted
  • Proposal
  • Proposal Added Incentive
  • Additional Timestamps

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

The Republic - Austin, TX - November 15, 2022 - NORTH

01/12

Pictured Above: Work has commenced to complete the ground floor pad.


Ramp construction is well underway and some forms are being put in place.

The Republic - Austin, TX - November 15, 2022 - EAST

1/6

Benefits of Direct Observation in Focus

Pictured Right: Notice the props and forms highlighted?


This image was taken at 7:16:02AM on a Tuesday.

Pictured Right: By the end of the day at 5:16:37 the props and forms are unmoved.



Pictured Right: 5:16:37PM timestamp.


What this shows is how direct observation can track progress with the exacting detail to accurately measure the timeline of progress. 


Casual photography and timelapse videos lack such detail. 

The Republic - Austin, TX - November 22, 2022 - SOUTH (No Considerable Change)

1/6

The Republic - Austin, TX - November 22, 2022 - NORTH (Ground pad nearing completion)

01/14

The Republic - Austin, TX - November 22, 2022 - EAST

1/6

The Republic - Austin, TX - November 30, 2022 - SOUTH (Exterior shear forms off & floor forms are being placed on some columns)

1/6

The Republic - Austin, TX - November 30, 2022 - NORTH

01/12

The Republic - Austin, TX - November 30, 2022 - EAST

1/8

The Republic - Austin, TX - December 1, 2022 - NORTH

1/10

The Republic - Austin, TX - December 1, 2022 - EAST

1/6

December 1, 2022 Time Intensive Material Delivery

A large delivery of post-tension (PT) cables indicates major floor work and concrete pouring is about to take place. 


While rebar provides an average of 60,000lbs psi of strength, PT cable deliver a whopping average of 270,000 psi.


Source: https://www.gp-radar.com/article/how-post-tensioned-cables-are-anchored-in-concrete-slabs

Pictured Right: On an unrelated construction site, tendons have been places in combination with steel rebar.


Source: https://www.suncoast-pt.com/services

Pictured Right: A lot of preparation and attention to detail goes into positioning PT cables before a concrete pour.


Source: https://www.gp-radar.com/article/how-post-tensioned-cables-are-anchored-in-concrete-slabs

Once the concrete has cured (3-10 days) the molds used to frame the floor are removed and a hydrolic jack pulls on the cable (highlighted) to give the floor its intended strength. 


Source: https://www.gp-radar.com/article/how-post-tensioned-cables-are-anchored-in-concrete-slabs

The Republic - Austin, TX - December 2, 2022 - SOUTH

1/6

The Republic - Austin, TX - December 2, 2022 - NORTH

1/6

The Republic - Austin, TX - December 2, 2022 - EAST

1/6

The Republic - Austin, TX - December 3, 2022 - SOUTH

1/6

The Republic - Austin, TX - December 3, 2022 - NORTH

1/6

The Republic - Austin, TX - December 3, 2022 - EAST

1/6

Continued in the next section: Time IV

Copyright © 2026 tedtalk.ai - All Rights Reserved.

This website attempts to measure the traffic it generates.

Cookies are deployed soley to analyze total visits. Your personal data is not collected and sold. Declining simply prevents your visit from being counted.

DeclineAccept